Email Updates:
Chronology of America’s Freight Railroads
In an era of interstate highways and quick air travel, it is difficult to imagine just how isolated those parts of the United States farthest from the oceans were, even as late as the mid-19th century.
The Benchwork Phase 1
Upgrading from a tabletop to a full room.
Benchwork for the Mountain Pass
When on a Colorado Mountain ridge, you can see three or four mountain ranges in the distance!
Full-sized Track Plan on Foam
In pursuing a better way to get my track plan from paper to benchwork, I ran across videos where modelers glued prints directly to the benchwork.
5.5% Grade, testing pulling power!
In pursuing a better way to get my track plan from paper to benchwork, I ran across videos where modelers glued prints directly to the benchwork.
The Art in the Details
As modelers, we pay attention to everyday life’s small details and oddities and try replicating those in our scenery.
The Electronics
This is an NCE DCC command system that will be running 3 Locos on a typical day. The outer loop is the main track power, and the inner loop is a reversing loop and will be fed from its own bus block.
Switch Machines vs Braces
Mark the vertical plane where your switch machines will be located BEFORE you install your bracing.
Valverde Feed Store Circa 1952
It’s 1952, and Anita comes across the street after visiting the Valverde Feed Store.
MRR Speedometer (Arduino)
Using a speedometer in model railroading helps ensure realistic train operation by measuring the scale speed of locomotives.
Modular Shelf Benchwork
My workbench needed to be a very well-built workbench and more than just a table—a foundation for productivity, precision, and creativity.











